|
Peer Façade System – Installation cont'd
- Premark, drill and countersink holes in the sheeting to be mounted in accordance with the board manufacturer’s recommendations.

- Fix the bottom row of boards allowing a 15 mm overlap over the EPDM seal
Leave the top row of screws in the board loose to facilitate the insertion of the backing strip to the board.
|
|
|
|