|
Peer Façade System – Installation cont'd
- Insert the backing strip behind the top of the board.

- Backing strip joint details – the backing strip has been designed to overlap whilst retaining a flush fit behind the board.
Backing strip joints must overlap the nearest Top Hat and be sealed with 2 beads of Sikoflex 11FC, Bostik Seal n Flex or equivalent sealer to ensure a water tight joint.
|
|
|
|