Peer Façade System – Installation cont'd
- Position the board to ensure that all joints are 10mm then fasten the board to the Top hats using appropriate fasteners.

- All screw heads must be filled with 2 pack filler as recommended by the board manufacturer.
Remove any rough edges form the predrilled holes using a scraper
Fill the screw holes with appropriate 2 pack filler as recommended by the board manufacturer.
Two separate applications of sealer will be needed to ensure any pinholes are filled and the filled screw heads are water tight

|
|
|
|